Skip to content
B BizSuite

For piling & foundation contractors

Know what every pile earned — before the job is over.

From the tender rate to the final account, BizSuite tracks every bored pile, every cubic metre of concrete, every tonne of steel and every litre of rig diesel against the contract that pays for it. Your job P&L is live, not a surprise at handover.

Interim Payment Certificate #6

Approved
Work done to date
4,850,000.00
Less: previously certified
(3,600,000.00)
Work this certificate
1,250,000.00
Less: advance recovery (10%)
(125,000.00)
Taxable value
1,125,000.00
VAT 5%
56,250.00
Less: retention held (10%)
(125,000.00)
Amount payable (AED)
1,056,250.00
Illustrative cumulative payment certificate showing advance recovery, VAT and retention.

The problem

What's costing you money today

Production measured on paper

Pile logs sit in site files while the IPC is prepared from memory. Under-claimed metres are money you never see.

Concrete and steel overruns found late

Over-break and wastage only show up when the supplier statement arrives — weeks after the pour.

Rig diesel nobody can reconcile

The site tank is filled, rigs are fuelled, and the numbers never meet. Diesel is the cost that leaks quietest.

Mobilisation advance and retention in a spreadsheet

Advance recovery, retention held, retention released — tracked by hand, and argued about at the final account.

The BizSuite way

Built around how your business actually works

Pile records drive the claim

Record each pile — reference, diameter, depth, concrete and cage — and the measured quantities flow straight into your payment certificate.

  • Production measured from the piles themselves
  • Design vs actual depth, concrete and cage weight per pile
  • Each pile linked to its BOQ item and rig

BOQ, cost codes and committed cost

Break the contract into BOQ lines and cost codes. Every LPO commits cost against them, so the forecast shows where the job will land — not just where it has been.

  • Budget vs committed vs actual per cost code
  • Cost-to-complete forecast
  • Tender estimate linked to the cost you now incur

Payment certificates (IPC) and retention

Cumulative interim certificates with previous-to-date logic, mobilisation advance recovery and retention withheld — posted to the ledger and invoiced with 5% VAT.

  • Advance recovery reduces the taxable base
  • Retention held and released on the record
  • Final account per project

Rig & site diesel control

Tank deliveries in, issues to each rig out, dips reconciled. Fuel cost lands on the project the rig was working on, and per machine for the equipment report.

  • Site tank reconciliation
  • Fuel logs per rig and per project
  • Operating cost per machine

Subcontractor packages

Award packages, certify subcontractor work, hold their retention and pay against certified value — the mirror of your own client certification.

  • Package value vs certified vs paid
  • Subcontractor retention ledger
  • Back-to-back with your own IPCs

Crews, timesheets and WPS

Daily attendance by site, timesheets by project, and labour cost allocated to the job the men actually worked on. Payroll exports a WPS SIF file for your bank.

  • Labour cost per project
  • Accommodation & transport cost per site
  • Visa, Emirates ID and labour card renewals tracked

How it flows

From first step to final margin

  1. 1

    Tender

    Price the BOQ in Estimating. The rates you win at become the budget.

  2. 2

    Mobilise

    Receive the mobilisation advance — recorded, with VAT, and recovered automatically from each IPC.

  3. 3

    Pile

    Site records piles, concrete, steel and diesel against the project every day.

  4. 4

    Certify

    Prepare the IPC from measured work; retention and advance recovery calculated for you.

  5. 5

    Invoice & collect

    An FTA-compliant tax invoice is raised from the certificate and tracked to payment.

  6. 6

    Close out

    Release retention and agree the final account — with the job's true margin in front of you.

Reports you'll use every week

The answers, without asking accounts

Live from the ledger and the site, exportable to Excel and PDF, filtered to what each person is allowed to see.

  • Project P&L and margin
  • Cost per pile / per metre
  • Budget vs committed vs actual
  • Retention receivable & payable
  • Diesel consumption per rig
  • Debtor ageing by client
Projects › P-0142 Marina Tower — Bored Piling

Contract (AED)

6,200,000

Certified (AED)

4,850,000

Cost to date (AED)

3,912,400

Margin

19.3%

Cost by category

Concrete 1,486,700
Steel 938,980
Labour 665,100
Equipment usage 469,490
Fuel 234,740
Other 117,390

Needs attention

  • IPC #7 due for submission in 3 days
  • Site tank variance: 412 L this week
  • 2 labour visas expire this month
Illustrative dashboard showing contract value, certified value, cost to date and margin, cost by category, and alerts.

Run more than one trade? BizSuite handles them together, on one ledger.

FAQ

Piling & Foundation: common questions

Can BizSuite prepare interim payment certificates (IPCs)?

Yes. Certificates are cumulative — this certificate, previous and to-date — with mobilisation advance recovery and retention calculated automatically, then invoiced with 5% UAE VAT.

How is retention handled for VAT?

Retention withholds payment, not tax: the full certified value is taxed when invoiced, and the retention is tracked as a receivable until it is released.

Does it track concrete and steel per pile?

Yes. Each pile record carries its design and actual depth, concrete volume and cage weight, and links to its BOQ item and rig — so quantities can be checked pile by pile.

Can we cost our rigs and cranes to each project?

Yes. Equipment usage, fuel and maintenance land on the project the machine served, while the equipment report still shows the full operating cost of each machine.

See BizSuite for Piling & Foundation

Book a live walkthrough. We'll show it with a contractor's real workflow — tender to final account — and answer every question about VAT, WPS and your month-end.

No commitment · Set up around your company · Your data stays exportable